LOAD REDUCTION SCHEDULE – KAE NEWS
Skip to content Eskom implements load reduction in high density areas and areas with high instances of meter bypassing and illegal connections to avoid network over loading. The load reduction is implemented in peak periods of 05:00 to 09:00 and 17:00 to 22:00. Load reduction is not implemented when there’s Load Shedding. Load shedding affects […]
